Dr lecturer

Effects of Environmental antecedents on Financing BOT Projects in Africa, A Case of the Rift Valley Consortium Kenya

Authors

  • stephen okelo University

DOI:

https://doi.org/10.14738/abr.98.10711

Keywords:

(Keywords Environmental antecedents, financing. BOT Projects, consortium)

Abstract

The purpose of this study was to investigate the effects of  Environmental factors  on financing BOT( Build Operate Transfer) infrastructure projects, Infrastructure plays a crucial role in the drive for achieving development by providing energy, transportation, and water. There have been ups and downs in the degree of emphasis placed on infrastructure, but infrastructure has remained the largest component of the public investment programs in developing countries 62 % of gross domestic product (GDP). Nearly half of the international financial institutions’ project lending to developing countries goes to infrastructure. The study used a mixed method research design; with a target population of 720 employees of rift valley rail consortium and government of Kenya representatives of which a sample of 338. The study used questionnaires and interview guides to collect data. Data were collected by administering questionnaires to the respondents while senior managers and government officials were interviewed. Data collected was coded. Qualitative data was analyzed using themes and sub-themes, while quantitative data was analyzed by the use of inferential statistics, of which the frequency percentages were calculated, data were cross-tabulated to establish the relationship within the variables and finally, a Wald test statistic was conducted to measure the strength and direction of relationship within the variables. A calculated Pearson Chi-Square of 0.818 lead to rejection of the null hypothesis and therefore, there is a significant relationship between Environmental antecedents and financing of BOT projects. The study recommended that there is a need for policies to be articulated on tackling the rise of environmental destruction due to the BOT projects in Kenya.

 

References

Beneš J, Hlédik T, Vávra D, Vlček J (2003): The Quarterly Projection Model and its Properties. In:Coats W, Laxton D, Rose D (Eds.): The Czech National Bank’s Forecasting and Policy AnalysisSystem. CNB, Prague.

Boone R.T., Macy M.W., Unlocking the Doors to Prisoner’s Dilemma: Dependence, Selectivity, and Cooperation, Social Psychology Quarterly, March 1999

Botman, Dennis P.J., Laxton, Douglas, Muir, Dirk and Romanov, Andrei,( 2006), "A New-Open-Economy-Macro Model for Fiscal Policy Evaluation." IMF Working Paper No. 06/45

Brůha J, Ščasný M (2005): Environmental Tax Reform Options and Designs for the Czech Republic: Policy and Economic Analysis. In: Deketelaere KL, Kreiser J, Milne H, Ashiabor A, Cavaliere (Eds.): Critical Issues in Environmental Taxation: International and Comparative Perspectives. Vol. III. Richmond Law & Tax Publisher Ltd, Richmond, UK, Chapter 17.

Cervero, R., Sullivan, C. (2011). Green TODs: Marrying Transit-Oriented Development and Green Urbanism. International Journal of Sustainable Development and World Ecology 18.3: 210-218.

Crampton, G. R. (2003). Economic development impacts of urban rail transport. Jyvaskyla, Finland: European Regional Science Conference

Estache, A. (2010). PPI partnerships vs. PPI divorces in LDCs. Review of Industrial Organization, 29, 3.26.

European Commission (2009) Report from the Commission to the Council and the European Parliament on monitoring development of the rail market. Commission staff working document

Farlam, P. (2005). Assessing Public–Private Partnerships in Africa: NEPAD Policy

Fitzgerald, P.F. (1998), "International project financing: an overview", Project Financing 1998 – Building Infrastructure Projects in Developing Markets, Practicing Law Institute, New York, NY,

Gray, S. F. (2004). Modelling the Conditional Distribution of Interest Rates as a Regime Switching Process. Journal of Financial Economics 42:27–62.

Greene D.L., Schäfer A. ( 2003)Reducing Greenhouse Gas Emissions from U.S. Transportation, Preparedfor the Pew Center on Global Climate Change, May 2003, Arlington, VA.

Grimsey D., Lewis M.K. (2005) “Are Public-Private Partnerships Value for Money?: Evaluating alternative approaches and comparing academic and practitioner views”, Accounting Forum, Vol. 29, pp. 345-378.

Guidebook on Promoting Good Governance in Public-Private Partnerships, in Kenya (2008) Government printer.

Handy, C. (2005). “Financing of Private Hydropower Projects,” World Bank Discussion Paper No. 420

Harris, S. (2004), "Public private partnerships: delivering better infrastructure services", Inter-American Development Bank, Washington, DC, working paper.

IMF (2004). “Exchange Rate Volatility and Trade Flows-Some New Evidence.” Washington, D.C.International Journal of Project Management, Vol 25, pp 66-76.

Katsioloudis and Mildred (2012). BOT viability model for large-scale infrastructure projects Journal of Construction Engineering and Management, 133(1), 50–63. doi: 10. 1061/(ASCE) 0733-9364(2007)133:1(50).

Levy, S. M. (1996). Build, operate, and transfer: Paving the way for tomorrow’s infrastructure. Wiley, New York, 18–20.

Li ,Akintoye, A., Beck, M., Hardcastle, C, Chinyio, E. and Asenova, D. (2001). The Financial Structure of Private Finance Initiative Projects. Proceedings: 17thARCOM Annual Conference.

Litman Todd, (2010), Evaluating Non-Motorized Transportation Benefits and Costs, Victoria, (Active transportation health benefits data is found in Volume 2, section 3.8, p 3-22).

Máca V, Melichar J, Scasný M (2009): External costs from energy generation and their internalisation in new member states. Paper presented at the Tenth Annual Global Conference on Environmental Taxation. Calouste Gulbenkian Foundation, Lisbon, 23–25 September

Mogila,B. Vashliev, M. and Nozhenko,H (2010). “FDI Trends,” Public Policy for the Private Sector Note No. 273 (World Bank, Washington, DC).

Myers, S.C., (1984). The capital structure puzzle. Journal of Finance 39, 575-592.

Olmstead, S. (2003). Water supply and poor communities: What’s price got to do with it? Environment, 22-34.

Pollitt H (2008): E3ME: An Energy-Environment-Economy model for Europe. A non-technical description – version 4.6. Cambridge Econometrics, Cambridge

Rapoport A., Games, Peace & Change. Special edition No. 19 1988, Vol. 13 Issue.

Rasmusen, E. (2001), Games and Information: An Introduction to Game Theory, 3rd

Scasný M, Máca V, Melichar J, Škopková H, Brabcová E, Brzobohatý T, Řízková M, Rečka L, Pavel J, Jílková J, Vítek L, Píša V, Markandya A, Kiulia O, Ortiz R, Pollitt H, Chewpreecha U (2006): Modelling of Environmental Tax Reform Impacts: The Czech ETR Stage II. Annual Report of SPII/4i1/52/07 R&D Project. Charles University Prague and IEEP University of Economics Prague

Scharle P., Public private partnership as a social game, Innovation, vol.15, no. 3, 2002.

Shapiro M, (2010). The Globalisation of Law. Global Legal Studies Journal, Vol 1.

Straffin P.D., Teoria gier, Wydawnictwo Naukowe Scholar, Warszawa 2004.

Topalovic P., M. Topalovic _ G. Krantzberg (2012), Center for Engineering and Public Policy, McMaster University, 1280 Main Street West, Hamilton, ON L8S 4K1, Canada Transport Policy Institute

Von Neumann and Morgenstern (1944). The history of Game Theory, Vol 1, From the Beginnings to 1945. Rutledge; London ECAP

World Bank. (2005). Philippines: Meeting infrastructure challenges. Washington, D.C.

Zhang, X. Q., and Kumaraswamy, M. M. (2001). “Procurement protocols for public-private partnered projects.” J. Constr. Eng. Manage.,127_5_, 351–358.

Zylicz T. (2002): Can there be an ecological “tax? In: Ščasný M (Ed.): Konsolidace Prague.

Downloads

Published

2021-09-04

How to Cite

okelo, stephen. (2021). Dr lecturer: Effects of Environmental antecedents on Financing BOT Projects in Africa, A Case of the Rift Valley Consortium Kenya. Archives of Business Research, 9(8), 145–163. https://doi.org/10.14738/abr.98.10711